Showing related tags and posts accross the entire site.
All Tags »
energy »
REC (RSS)
-
The new legislation which is expected to be brought in on 1st July 2009 will - allow anyone installing a new Grid Connected Photovoltaic Generator, to receive 5 times the normal amount of Renewable Energy Certificates for the first 1.5kW of installed capacity, with any capacity above 1.5kW receiving...
Page 1 of 1 (1 items)